(Time Estimate and Float)
Â
1.        Information on the activities required for a project is as follows :
Activity : |
1 – 2 |
1 – 3 |
1 – 4 |
2 – 5 |
3 – 5 |
3 – 6 |
3 – 7 |
4 – 6 |
5 – 7 |
6 – 8 |
7 – 8 |
Duration (days) : |
2 |
7 |
8 |
3 |
6 |
10 |
4 |
6 |
2 |
5 |
6 |
2.        A small assembly plant assembles PC’s through 9 interlinked activities. The time duration for which is given below :
Activity : |
1 – 2 |
1 – 3 |
1 – 4 |
2 – 5 |
3 – 6 |
3 – 7 |
4 – 6 |
5 – 8 |
6 – 9 |
7 – 8 |
8 – 9 |
Duration (hrs.) : |
2 |
2 |
1 |
4 |
8 |
5 |
3 |
1 |
5 |
4 |
3 |
3.        A small assembly plant assembles PCs through 9 interlinked activities, the time duration for which is given below :
Activity |
1 – 2 |
1 – 3 |
1 – 4 |
2 – 5 |
3 – 6 |
3 – 7 |
4 – 6 |
5 – 8 |
6 – 9 |
7 – 8 |
8 – 9 |
Duration (hrs) : |
2 |
2 |
1 |
4 |
8 |
5 |
3 |
1 |
5 |
4 |
3 |
a)Â Â Â Â Â Draw a network diagram for it and calculate and tabulate for each activity: ES, EF, LS and LF times.
b)Â Â Â Â Â Find the critical and sub critical paths. Calculate and tabulate all Float.
         (Oct. 03)
4.        Following are the details of estimated times of activities for a certain project.
Activity |
A |
B |
C |
D |
E |
F |
Immediate Predecessor /Activity |
– |
A |
A |
B, C |
– |
E |
Estimated Time (Weeks) |
2 |
3 |
4 |
6 |
2 |
8 |
(a)Â Â Â Find the critical path and expected time of the project.
(b)Â Â Â Calculate the earliest start time, earliest finish time and slack for each activity.
(April 2004)Â Â
5.
Activity : |
1 – 2 |
1 – 3 |
1 – 4 |
2 – 5 |
3 – 5 |
3 – 6 |
3 – 7 |
4 – 6 |
5 – 7 |
6 – 8 |
7 – 8 |
Duration : |
2 |
7 |
8 |
3 |
6 |
10 |
4 |
6 |
2 |
5 |
6 |
From the following table determine and calculate all the floats, ES, EF, LS, LF
 (Oct. 2005)
Â
6.        Activities involved in a small project are given below along with relevant information.
Activity : |
1 – 2 |
1 – 3 |
2 – 3 |
2 – 4 |
3 – 4 |
4 – 5 |
Duration : |
20 |
25 |
10 |
12 |
6 |
10 |
(a)Â Â Â Â Construct the network and find the critical path
(b)    Find and tabulate ES,EF,LF,LS, TF, Interfering float                        (April 2009)